Detailed design begins

From the building diary. This entry records the project at the date above. Plans, prices and measurements are historical; any tour dates or booking instructions are no longer current.

English translation of the original Swedish diary entry. Swedish original below. Plans and observations belong to the time of writing.

The appeal has been withdrawn, and detailed design is now in full swing!

Palmatin is working on the house drawings. Naturhusgruppen is developing the detailed drawings and inspection plan and coordinating with Drivadan. Nordea is arranging the construction loan. A lot has to happen before building can start. The provisional date for the municipal technical consultation is 19 November, so most of the documents need to be ready by then.

As the plot is outside a detailed development-plan area, we can at least begin digging to understand the bedrock. If we are unlucky, some will need blasting or splitting. The main construction work probably will not begin until spring.

Exciting!

Read the Swedish original — Projektering
Överklagan är tillbakadragen och nu är projekteringen i full gång! Palmatin jobbar på ritningar till huset. Naturhusgruppen jobbar vidare med detaljritningar, kontrollplan, synkning med Drivadan etc. Nordea sätter upp byggkreditiv. Mycket som ska till innan bygget kan starta. Preliminärt datum för samrådsmötet med kommunen är 19 nov. så till dess behöver de flesta dokument vara klara. Eftersom tomten ligger utanför detaljplanerat område så kan vi i alla fall börja gräva för att få bättre koll på hur berget ligger, har vi otur måste en del sprängas eller spräckas bort Troligen blir det inte riktig byggstart förrän i vår. Spännande!