From the first planning notes to life under glass: 41 entries following the build and the years that came after, from 2014 to 2019.
Reading the diary. Every entry is available in English. The earlier Swedish entries include a translation and their original text. Prices, plans, measurements and tour dates belong to the time of writing; old booking instructions are no longer current.



2014 · From idea to groundworks
2015 · Greenhouse and timber house
2016 · First seasons and the water cycle
2017–2019 · Living with the house
Historical technical pages
The diary is only part of the archive. Preserved historical pages on this site cover the water system and growing beds, design and planning process, planning drawings, timber house, greenhouse and historical measurements.
Original dates and URLs are preserved. Swedish originals remain alongside the translations; English entries have received light spelling and grammar corrections. Historical plans and measurements retain their context.